Loyang Avenue Solar Installation: 13 kWp on a Low-Pitch Metal Roof, $4,033 a Year

By Wei Lin3 min read

21 black monocrystalline panels rail-mounted to a grey corrugated metal roof in the Loyang estate, installed in a single day with no structural work. Here's what this system actually involved and saves.

Quick answer

This Loyang Avenue home installed a 13 kWp system of 21 black monocrystalline panels, rail-mounted to a grey corrugated metal roof with a low pitch that maximised usable roof area. The system needed no structural work and was completed in a single day. Sunnify projects around $336 a month, roughly $4,033 a year, based on the same Q3 2026 tariff and self-consumption assumptions used across every documented installation.

1 day

Time to complete this 21-panel, 13 kWp installation on a low-pitch corrugated metal roof at Loyang Avenue, with no structural work required

21 black monocrystalline panels rail-mounted to a grey corrugated metal roof, completed in a single day with no structural work. Here's what this 13 kWp installation in the Loyang estate near Pasir Ris actually involved, and what it saves.

What was actually installed at this home?

21 black monocrystalline panels totalling 13 kWp, rail-mounted to the existing corrugated metal roof profile. The roof's low-pitch design meant panels could be laid out across a wide, largely unobstructed area without the layout compromises a steeper or more fragmented roof shape often forces.

Why does the low pitch actually matter here?

A shallower roof slope maximised usable roof area for this specific property, letting the full 21-panel array sit at a consistent, unbroken orientation rather than being split across multiple smaller sections. Singapore's near-equatorial sun path also means a low-pitch roof isn't the generation penalty it would be at a higher latitude, where a shallow angle misses more of a low winter sun.

See how roof orientation and pitch actually affect generation for the fuller mechanics behind this.

How was the system mounted, and why no structural work?

Rail-mounted directly to the existing corrugated profile, a standard approach for metal roofing in sound condition. Corrugated metal roofs generally accept this kind of mount without added reinforcement, since the material and existing structure underneath were already confirmed capable of carrying the system's weight before installation began.

This kept the project to a single day on site, with no waiting on structural assessment results or remedial work before mounting could start.

Does a low-pitch roof actually drain properly with panels installed?

A low-pitch roof relies more on its surface finish and gutter design than a steep roof does to shed Singapore's frequent, heavy rainfall, so panel placement has to work with the roof's existing drainage pattern rather than diverting flow toward a point the roof wasn't designed to handle. A rail-mounted system following the existing profile, as used here, avoids creating a new dam or pooling point.

This is a real installation-planning detail worth an installer raising proactively during the site survey, not one to discover only after the first heavy storm following installation.

How much does this system actually save?

Around $336 a month, roughly $4,033 a year, based on Sunnify's projection for this 13 kWp system at the Q3 2026 EMA regulated tariff of S$0.3478/kWh, 25% self-consumption, and an SCT export credit of S$0.2581/kWh. This sits a step above a standard 12 kWp system's savings, tracking the modestly larger array size.

How does this compare to a similarly fast installation elsewhere?

Like the ballasted flat-roof system at Lim Ah Pin Road, this installation's speed came from a roof type that needed no structural remediation or complex sectioning before mounting could begin. Different roof types, metal versus flat concrete, reached the same practical outcome for a different underlying reason.

What would a similar metal roof need to consider?

Confirm the existing roof structure's condition before assuming a fast, structural-work-free installation transfers directly, since an older or already-compromised metal roof may need remedial work first. See waterproofing and structural considerations for a solar installation for what an installer should actually be checking.

Run the full roof suitability checklist to assess your own roof, and the Sunnify solar estimate to see what a similar system could save on your property.

FAQ

Frequently asked questions

Not necessarily, and it can work the other way. A shallower slope near Singapore's near-equatorial latitude can sit close to an already-favourable angle for year-round generation, while also opening up more usable roof area than a steeper pitch would for the same footprint.

Corrugated metal roofing generally accepts a rail-mounted system directly onto its existing profile without added reinforcement, provided the roof structure underneath is already in sound condition. This isn't automatic on every metal roof, and confirming the existing structure's condition first is still a real step, not an assumption.

It sits toward the middle of the range Sunnify has documented, larger than a compact terrace system but well below the largest bungalow-scale installations. The right size for any specific property depends on that roof's own usable area and the household's electricity usage, not a fixed benchmark.

Start with clarity. Then decide.

Get a personalised estimate in minutes, then request a site review only when you're ready. No obligation, ever.

No obligationNo sales callTwo minutes
  • No-obligation estimate
  • Every assumption shown
  • Site review only when ready
Talk to Us