Solar Energy Terms Explained: A Singapore Glossary

By Wei Lin4 min read

kWp, ECIS, SCT, LEW: Singapore solar comes with its own vocabulary. Here is every term defined in one sentence each, in plain English.

Quick answer

Singapore solar comes with its own vocabulary, kWp, ECIS, SCT, LEW, DLP, GEF, and more, much of it specific to EMA and SP Group's regulatory framework rather than terms used in solar guides written for other countries. Below is every term defined in one sentence each, organised by category.

Singapore solar comes with its own vocabulary, much of it specific to EMA and SP Group's regulatory framework rather than terms used elsewhere. Below is every term a Singapore landed homeowner is likely to encounter, defined in one sentence each.

System and generation terms

TermDefinition
kWpKilowatt-peak. A solar system's installed capacity, how much power it can produce under ideal, standardised test conditions.
kWhKilowatt-hour. A unit of actual energy generated or consumed over time, the unit your SP Group bill is charged in.
Peak sun hours (PSH)An annual average measure of usable sunlight intensity. Singapore averages 4.33 peak sun hours per day, already accounting for cloudy days across the year.
DegradationThe gradual decline in a panel's output over time, typically around 0.5% per year, meaning a panel still produces roughly 88% of its original output after 25 years.
Self-consumptionThe share of your solar generation that your household uses directly, rather than exporting to the grid. Higher self-consumption generally means higher savings, since self-consumed power avoids the full retail tariff.
P50 / P90Statistical confidence levels used in generation estimates. A P50 estimate is expected to be met or exceeded 50% of the time; a P90 estimate is a more conservative figure expected to be met 90% of the time.

Financial and billing terms

TermDefinition
Retail tariffThe rate you pay to buy electricity from the grid, currently S$0.3478 per kWh including GST.
SCT (Simplified Credit Treatment)The export scheme for SP Group regulated-tariff customers, crediting exported solar at a fixed rate, currently around S$0.2581 per kWh, lower than the retail tariff.
ECISEnhanced Central Intermediary Scheme. The export scheme for customers buying electricity from an OEM retailer instead of SP Group, crediting exported solar at the variable half-hourly wholesale electricity price rather than a fixed rate.
NER / Net Export RebateNot a separate scheme. The name tied to the application form used to register for either SCT or ECIS.
Net meteringA billing approach used in some other countries where exported solar is credited at the same rate as imported electricity. Singapore does not use net metering; exported solar is credited at the lower SCT or ECIS rate instead, depending on your electricity plan.
Payback periodThe number of years it takes a system's cumulative savings to equal its upfront installed cost, typically 4 to 5 years for a suitable Singapore landed home.

Regulatory and installer terms

TermDefinition
LEWLicensed Electrical Worker. A qualified professional legally required to sign off on a solar system's electrical design and installation in Singapore.
BCA ME03A licensing classification from the Building and Construction Authority that qualifies a contractor to carry out mechanical and electrical works including solar installation.
EMAEnergy Market Authority. Singapore's electricity regulator, responsible for grid safety rules including the anti-islanding requirement that shuts solar panels off during a blackout.
Anti-islandingA required safety feature that automatically disconnects a grid-tied solar system during a grid outage, protecting utility workers repairing the fault.
Single-phase / three-phaseTwo types of electrical supply. Single-phase caps a home in the roughly 10 to 13kWp range of solar capacity, confirmed case by case with SP Group; three-phase removes that ceiling.

Equipment and technology terms

TermDefinition
Balance of System (BOS)Every solar component besides the panels themselves: inverter, mounting, wiring, disconnects, and monitoring equipment.
PERC / TOPCon / HJTThree successive generations of silicon solar cell design, each a real efficiency and heat-tolerance improvement over the last.
ABC (All Back Contact)A cell design that moves every electrical contact to the rear of the panel, removing visible front-side wiring and improving efficiency.
IEC 61215 / IEC 61730The two core international certifications confirming a panel has been tested for durability (61215) and electrical and fire safety (61730).

Contract and sustainability terms

TermDefinition
DLP (Defects Liability Period)The window in a solar contract, typically around 12 months, during which the installer must fix workmanship defects at no extra cost.
GEF (Grid Emission Factor)The amount of CO2 produced generating each kWh on Singapore's national grid, used to calculate a solar system's carbon offset.
REC (Renewable Energy Certificate)A separate, tradable certificate proving a unit of renewable electricity was generated, distinct from the physical export credit a system earns.
Green MarkBCA's certification scheme for building sustainability, where solar contributes as one criterion among several, not the certification itself.
GMIS-EB 2.0BCA's cash cofunding scheme for Green Mark retrofits, capped at S$1.5 million but requiring a 5,000 sqm floor area that excludes individual homes.

Further reading: see how solar export works in Singapore for the ECIS and SCT mechanics in full, and solar payback period in Singapore for how these terms combine into an actual return calculation. Run the Sunnify solar estimate to see these exact figures applied properly to your own specific home and roof.

FAQ

Frequently asked questions

kWp (kilowatt-peak) measures a system's installed capacity, how much power it can produce under ideal conditions. kWh (kilowatt-hour) measures actual energy generated or consumed over time. A 15kWp system does not generate 15kWh every hour; it generates roughly 15 kWh per kWp per year on average in Singapore, or about 16,600 kWh annually for a 15kWp system.

Terms like ECIS and SCT are specific to Singapore's own regulatory framework, run by EMA and SP Group, and do not map exactly onto terms like net metering used elsewhere. Singapore actually runs two separate export schemes, SCT for SP Group regulated-tariff customers and ECIS for retailer customers, and neither credits exported solar at the same rate as imported electricity the way true net metering does, which is why the terminology and the mechanics both differ.

Start with clarity. Then decide.

Get a personalised estimate in minutes, then request a site review only when you're ready. No obligation, ever.

No obligationNo sales callTwo minutes
  • No-obligation estimate
  • Every assumption shown
  • Site review only when ready
Talk to Us